Martin McDonald | 03/08/2009 23:30:54 |
4 forum posts | I have almost finished a 2" scale traction engine boiler but wish to add a second water inlet connection along the barrel as well as to drill and tap the boiler top for the cylinder mounting studs. I propose to follow Alec Farmer's recomendations in 'Model Locomotive Boilermaking' for the actual water connection but what is the best way to drill and tap holes in an otherwise finished boiler in such a way as to minimise the ingress of swarf or, indeed, to extract it ? Any comments and recommendations on this would be most welcome. |
Geoff Theasby | 04/08/2009 04:07:16 |
615 forum posts 21 photos | My Dad taught me how to drill a car inlet manifold in situ, in order to fit a vacuum gauge.
Basically, don't let the drill break through more than a minimum amount and grease the tap.
Regards
Geoff Theasby |
Please login to post a reply.
Want the latest issue of Model Engineer or Model Engineers' Workshop? Use our magazine locator links to find your nearest stockist!
Sign up to our newsletter and get a free digital issue.
You can unsubscribe at anytime. View our privacy policy at www.mortons.co.uk/privacy
You can contact us by phone, mail or email about the magazines including becoming a contributor, submitting reader's letters or making queries about articles. You can also get in touch about this website, advertising or other general issues.
Click THIS LINK for full contact details.
For subscription issues please see THIS LINK.