05/07/2017 16:26:10

Hallo Ron,

for my opinion and knowledge by making my own injectors,it is a copy of a commercial design, you have not enough steam to drive the water out of the nozzle. Your valve or your pipe to the injector is not sufficient in size.

Please take a look to the link **LINK**

John Baguley has a very good explanation on his side with pictures and explanation.

What I said above is correct if never an injector worked on this loco. On the otherhand it could be that the steam nozzle has to low penetration to the combining cone or has a slightly to much bore. All this give the same effect.

I am not an expert ,but I collect a lot of experience by copying the injectors. My friend copied my tools and reamers and he was able to build his own injectors too.

Werner

Edited By Werner Schleidt on 05/07/2017 16:27:18

Thread: Merryweather Steam Fire King self propelled
25/06/2017 08:01:28

Hello ,

I want to tell that my self build oil pump is now working satisfying. To get this it was unbelieveable easy. From a colleage i get the tip that he used a flat NBR rubber with a guide for the spring.

In my design, a copy of a Martin Evans design, i had a support piece to guide the spring and that pressures the stainless steel ball. And that was not perfect thight.

I was looking for flat rubber material and I found it in a large seal. I took a caliper to make holes in belts and adjust the right diameter an gave it a try.

That little flat piecet was tight at the beginning and under steam too.

This Video was made with the idea to have more driving experience and to look how much can I climb the hill track. My Firefighters are well prepared to do theire job now.

I hope you can enjoy it

Werner

Thread: Hello I am a new member from Germany
20/06/2017 18:06:34

I have a question regarding compound driving.

In the last post I described the driving procedure of my compound mallet during the start procedure.

Can anyone describe something similar for his compound machine or something different ?

best regards

Werner

Thread: Merryweather Steam Fire King self propelled
15/06/2017 15:18:22

Hello ,

thanks for the nice replies.

Norman ,even if it is funny but it is good to know what you need in traction effort. Many years ago I calculate for a friend for his thomson tennant traction engine in a similar way with a good result. And I know the traction effort of my locomotives. Knowledge gives a good convidence even if it`s made with primitive possibilities.

As the frame was ready with cylinder and propulsion sytem I made the same test with 2 bar on the cylinder in the basement with a good effort and I was glad as the engine starts that the hose was short it prevents from an accident.

I want to add a picture of my clinder cover. Made from brass formed by hand and bended over a piece of pipe and refined with a small Merryweather sign. This sign was made and interpreted after old pictures of a stamped sign.

I interpreted it as good as possible from the details of the pictures.

20170501_093052.jpg

My fireman got now a footstool with a stand and so he can do better his job.

20170611_092408.jpg

And the second fireman is eagerly waiting for his first work under real conditions his first test was very successful.

20170604_124613.jpg

Fitted with an old breakfast plate and pole in the britches over booty  to the head so the poor guy is under pressure to do his next job.

Werner

 

Edited By Werner Schleidt on 15/06/2017 15:21:58

Edited By Werner Schleidt on 15/06/2017 15:27:13

15/06/2017 11:10:10

Hello David ,

thank you for your reply . I looked in Germany to conveyor belt rubber or flat drive belt. And don`t laugh to heel rubber. And I emailed MJ engineering, but I got no answer. From carriage suplier in Germany I only found that they make hot moulding for a high price. But thank you for your tip I will search again ,sometimes it is difficult to find the right keywords.

I have time until winter. Good things need time.

And with my construction of the Fire King I was much faster as I thought.

Werner

15/06/2017 08:40:33

Hello ,

thanks to all for the positive commands.

On the second test ride I found that the fire water pump is not able to get water from the suction hose.

I was frustrated ,but never give up. So I investigated what is the the problem.I made a setup in my garage and put the boiler under air pressure. So I could run all for testing. After several test I found out that my compression gland is not suction tight. And I decided that I use only one water cylinder, because it was very difficult to get them out ,because the boiler is very close and it was difficult to come to the screws.

After that I tried the pump again and it worked. Than I regognized with the water pressure it can build, that my flat hose is not thight. With several steps I got it under control. Than I made a special nozzle adapted to the flow the pump can bring. Here my experience making injector nozzles were very helpful.

In normal working condition it can spray 5 to 6 meters wide. But I found that the ports to the check valves were very small. I started to rework one cylinder to get more flow and less back pressure, but this is not ready now.

On a very hot second driving day on our club track I gave the fire king a 3. test ride.

The test target was to found out how far I can drive with which amount of coal and how stable is the mechanical system. And testing my new made pop valves.

Close by our club track we can drive to the junction of the river rhine and main with a nice look to the city of Mainz. That means a trip of 3 Km in total .I started with smaller steps of a about 1.2 Km in total. After two rounds it looked very good. And I ignored in that positiv sight that on the first round the oil pump failed. I had changed my mounting system and so I was able to replace it in a short time.

On the first round we had proplems with one of the safety valves it stucked half open. The boiler hold 3 bar and we came back .With a small electronic pliers I gave a full lift and the valve was thight again and in full function.

I had the feeling that there is some dirt in the boiler from soldering.

After two rounds, water and pressure,mechanic and all was OK I decide to drive wider than before. I drove than about 1.4 Km and 100 meter to the base I ran out of water. I drove the machine into the gras on the side of the street and ran to took 5 Liter of feed water.

All systems was OK on that day. In total I drove about 5 Km that was satisfying. Then we made a fire pump session . There was lot of improvisation to adjust the water jet. The idea came up to have a firemen with a water nozzle in his hand.

The only remaining problem I have is that the rubber glued on the wheels is to soft with 65 shore. It is more a stone collecting rubber . And in winter I have to replace it. to hard rubber , but I have at the moment no idea were I can get the replacement.

Here is the video of that day

 
 
I hope you can enjoy it.
 
 
 
best regards
 
Werner

 

 

Edited By Werner Schleidt on 15/06/2017 08:41:07

14/06/2017 20:22:54

Hello,

after the fire king was out of the basement I paint my sit car that it fit to the fire king. I tried to give the car a look similar to fire fighter car. So I mounted suction hoses and build some fire fighter ladders.

Then I was waiting to the first steam up. In the time between I tested the pumps and all attachements with pressurised air .After the pumps worked well I decided to steam up.

The documentation of the first steaming and the steaming on the DBC Rhein-Main e.V. I put together in a video.

After the first steam test I had problems with my self build oil pump.The check valve was not steam tight.
My stays at the wheels getting loose. With nuts with plastic inlay and loctite I tighten the stays .
On the second steam up the rubber tires and the rubber metal glue get loose.
It was very hard work over a few days to cut the glue from the metal with the rubber the glue has no connection.
Werner
14/06/2017 09:12:42

Hello ,

I describe now the next steps. The wheels were covered with rubber.

The pipe work was done with check valve ,bypass valves and so on.

The plates were fitted. The watertank and the front box get theire golden lines.

And email conversation was made with the hungerford virtual museum, merryweather and sons to find out what was in the box under the driver seat,because I had found no pictures of that stuff. I got some information material and I made my interpretation of it.

20170320_182521.jpg

The front is nearly ready .20170320_182649.jpg

The first time out of the basement . We pulled it out with an electrical winch carefully over the stairs.20170401_142250.jpg

The black suction hose on the front is a standard suction hose for a gardenpump.It looked terrible like plastic. The idea came up to wrap around a mull bandage and paint it black. Now it looks like a suction hose.

More pictures and step by step you can see in my video.

I hope you can enjoy the video.

Werner

14/06/2017 08:33:42

Hello ,

after the boiler was ready covered I had a big step forward.

Some time in between i build some parts like the front lamps. It was hard to decide which form I have to build ,because the original I had in my pictures are adapted several times with different lamps.

The technical change from oil to gas lamps forced other look of the lamps.

At first I made quick and dirty a cardboard lamp and found it is to big, then I made a sketch for the right lamp.

20161116_192801.jpg

It was decided that the lamps in the model are iluminated by LED.

20161120_140311.jpg

From a colleage I got a defect LED lamp after stripping I found that the voltage and current control chip was defective. The LED s were very well. I made than several tries to find a solution that they look similar to a petrol powered one.

After I found a solution for "the burner" I decided to make a battery holder like a fireextinguisher for 3 AA cells.On the top the handle is the power switch. And I have to found a solution for easy connection of the power lines.

The picture shows the holder and power connector.

20161124_190706.jpg

Here is the battery holder and the handle is the switch.

20161212_072129.jpg

And here are the lamps installed.

20161126_164822.jpg

The firefighter was a special addition for the company Ziegler a german fire truck builder and is made by Steiff dolls.

The next work intensiv step was doing the plate work.

I was looking for Merryweather plate which are in the same time on the originals.

With the free program inscape it was possible to make and overlay from the original and the new sketch.After a good fit it allowed to separate again sketch and picture.

The used technic is the same as etching printed circuit boards , but you need much more time and new acid to get 0,25 mm deepness for the letters.

20170219_130028.jpg

The brass is covered with a photoresistant paint. It is not easy to clean the brass and make a clean job.

After one day of driying it was 5 minute developed with ultra violet light by special light tubes.

20170219_130612.jpg

Here is the developed plate with photoresitant.

20170219_130017.jpg

In this improvised etching box with heating and air bubbles it was made.

20170219_150041.jpg

After some days of work I got this result. The left plate is very good the right Mw. plate is not deep enough etched. My acid was not good anymore. I have to have a new one.

20170223_072151.jpg

The lamps get their small plates as big as thumb nail

20170225_170740.jpg

and the fire extinguisher

20170225_175018.jpg

Werner

13/06/2017 20:22:15

Thankyou Neil !

After painting I made many small work with much time lost.

The boiler insulating is a time intensive job ,but this was nothing in the comparison of boring and making the M2 threads in aluminum. I had the feeling it was hundreds to bore and making the threads.

20161229_112204.jpg

The boiler cover in brass was very difficult to made . The bending and rolling of the sheet was made by hand..

A template was made from cardboard the bores for the inputs and outputs were very difficult to transfer. And I learned that a round bore is eliptic on a bended metal cover. After that work with bending and rolling the sheet metal by hand I had pain in my hands.

20161229_191544.jpg

Werner

13/06/2017 14:29:09

Hello ,

the next big step was the steam engine. I had no experience how big it have to be and what traction effort is needed by road driving.

So my son and I made a test with grandmother s walking frame. I take seat and my son pulled with a luggage scale. The pulling force was in minimum 100 N. From traction engine coleage I know that he pulled on first gear a small car. So I ball park 500 N.

Then I calculated the gear ratio of my chain drives and added a two speed gear to the setup. In second gear the steam engine should run 500 rpm .With all these calculations and some rule of thumb I came to 42 mm bore and 60 to 70 mm stroke on the engine and a overall gear of 8 to 1. So I hoped with this setup I am in the 6 Km/h rule in germany and enough power to drive with two adults.

By chance I saw in the second hand area of Maxitrak Cylinder with piston bore ready but all other stuff I made by my self. In eastern 2016 the engine runs.

20160404_070804.jpg

In summer I saw some rust on the steel parts, so it was clear I have to paint.

Before I tried to get all ready for the paint job.

The next picture is befor painting.

20160408_071133.jpg

That was lot of work to do.

This is part 1 of the video with the steps I discribed and some more

All steps I put together to an video on my youtube channel javamallet. i hope you can enjoy the video

Werner

13/06/2017 13:34:17

Helllo,

thanks to all who leave a comment . I have no problem with constructiv asks and critism.

After the overall drawing I start with ordering of material for the wheel attachments and for the frame and spring attachments .

After some months it look like this

20150215_161119.jpg

Next step was building the steering gear.

It is on the left side on the front axle. It is made from trapezoid spindle with a gunmetal nut. On the nut there is

attached a pin with a screw in the middle of the nut and this is sliding in a slot in the housing.

The whole is than connected to a L lever with connection to the track bar and the tie rods. The setup is like

Lankensberger (munich coach builder) or better known as Ackermann setup.

20150301_202745.jpg

with some cardboard I was dreaming how it can look if it is ready that was in summer 2015

20150410_200748.jpg

For my opinion such cardboard prototypes are extrem helpful to get the right dimensions.Please keep in mind I have only old photos and no sketch of it.

Next step the tea pot locomotive boiler lost the heat transfer sheet metal. It was not easy cutting and milling it away with my small mill.

 

20141025_075039.jpg

some steps are worked in parallel the discription is one after the other.

The brass top of the boiler was not easy to get. Such pots are today only in stainless steel to get ,but by chance I saw in.bay a brass flower pot very cheap and with the stones  in the house wall I had an idea how big it is.

In former times it was a pot from a sugar baker and then degradated to a flower pot. I cut the handles away and cut the upper side for the chimney. And I tried to buckling and finishing the old stuff. It looked not so bad but it was still in a conical shape. With three rolls ,all conical , two on the bed of the mill and one upside down in the bore head ,I tried to bend 10 milimeters from the downside to a cylindrical shape. That went good after some hours of work. And some hammering with a plastic hammer.

 

20151022_071750.jpg

the working parts for the bolier and the adapter to come out of the insulation was made.

20151122_132439.jpg

The fire door attachment was very difficult and made in several hours .It opens to floor direction ,because I think it is better to operate like this during driving.

Werner

 

Edited By Werner Schleidt on 13/06/2017 13:38:15

13/06/2017 09:42:25

Hello ,

I continue with the wheel construction.

20141206_074400.jpg

the spokes are milled on the edges

The ring was turned on a mill, the beech wood was very hard

20141210_182403.jpg

The ring was turned by hand

20141130_183521.jpg

Now one wheel is ready clued together with with white wood glue and get his outside trim. It was not easy to get the same diameter for two wheels under this primitve circumstance.

After the wheels were ready, a drawing was made to the best fit of the old picture of the fire king and the size

of the boiler . And I had a look to my transport capabilities.

20141226_104101.jpg

 

Werner

 

Edited By Werner Schleidt on 13/06/2017 09:45:02

13/06/2017 09:02:36

Hello ,

I want to share my work on a freelance construction of my fire king self propelled.

All started with an auction on .bay UK with an vertical boiler of De Winton tea pot boiler. After I have this in my hands ,a nice made swindon boiler, I looked to an original locomotive to build.

Then on our club we had a visit of friends from the DMC Schweiz with an traction engine and now I recognized I have a few steam locos and it would be nice to have an traction engine.

Then I searched for an original with an vertical steam boiler. So I found photos of a Merryweather steam fire king self propelled.

And that was my base to construct and built with a close fit to the picture my unique fire king.

This is my second steam ride with it.

20170430_133944 b.jpg

This is the result of about 1000 hours of work in more than 2.5 years.

The beginning was the making of the wheels in relation of the bolier size and my transport possibilities. I had many limitations of my workshop capabillities to overcome and I learned a lot.

The backwheel under construction

20141130_183609.jpg

best regards

Werner

it will be updated

Edited By Werner Schleidt on 13/06/2017 09:05:22

Edited By Werner Schleidt on 13/06/2017 09:27:33

Thread: Hello I am a new member from Germany
11/06/2017 19:09:24

Thankyou Dave and Neil ,

for embedding the video. I did not understand the discriction for embedding the youtube videos, but I looked to other threads and now I think I got it for the next time.

Dave the wheelslip on the first test looked nice in the video ,but for the driver it was very frustating.

And that is now with compound action completly different. I start with a start valve which allows fresh steam to come to the front cylinder. The pipe to the cylinder is small so there is some throttel action for the steam.

I opened the compound tank valve and start then with the steam valve the high pressure cylinder. If all cylinders are warmed up, the Mallet starts to drive with nearly no wheel step. After 10 Meters I close the compound tank and pressure rise up in the compound tank and throttles a little bit the high pressure cylinder,because of back pressure. Between compound tank and the low pressure cylinder is non return valve.The pressure then overcomes the pressure on the low pressure cylinder . If the pressure is higher from the compound tank then the throttled fresh steam from the boiler the loco starts to run in compound. Then after some 5 to 10 meters I close the start valve and open more the steam valve.

The pressure ratio is than about 6 bar at the high pressure cylinder and 3 bar at the low pressure cylinder.

They work then nearly with the same traction force. And If Idrive with this loco on our club trak with smooth inclinations ,but narrow curve radius the loco runs nearly the same speed.

With a comparable two cylinder setup I have to control more often.

The next big step is stripping and painting the Mallet.

best regards

Werner

11/06/2017 10:08:33
Hello Dave ,
 
I have no picture store space at the net and at the moment I am not familar with the possibillities of the forum
here. But the link below is one video of my youtube channel and it is the documentation of the Java Mallet.
It has a Cheddar boiler and the rest is constructed by my own. It is a freelance construction and had now after
several years of improvements nearly the same power as my 2 cylinder locomotives with the same boiler type.
 
The video describes building and running the loco. The commands are in german.
At first it was a 4 cylinder set up all cylinders get the same pressure . It runs but coal and water consumptio was extraordinary.
Then I changed the setup to compound in several steps over the years. With each step there were improvements.
At first I made a setup with compound ,but very difficult operation in the start procedure.
Next step was to get that easier. A next step was to re heat the used steam of the high pressure cylinder.
Next step was adding a pressure gauge to see at the low pressure cylinder after 20 m after start with 6 bar bolier pressure and throthle full open there were 3 bar at the low pressure cylinder.
 
Yes all cylinder have the same bore and travel.On this small loco ther is a lot of thermal loss so it is not possible to compare to fullsize with the totally different bore ratios.
The last big step forward was adding a double peticoat in the smokebox and a smaller steam nozzle.
You can see it in the link below. My discription is similar to the explanations in german in the video.
 
 
I hope you can enjoy it.
 
Werner

Edited By Neil Wyatt on 11/06/2017 14:06:52

11/06/2017 09:34:47

Hello,

my name is Werner and I am new in this forum. I had build at the beginning 30 years ago small Rc controlled gas fired steam locos and later I came by chance to the 5 inch gauge by an Maxitrak kit. After a few self constructed locomotives, 2 Tramway ( Chiemseebahn, a freelance Wiliam Wilkinson ) I started building a Java Mallet in compound action. The original runs in the Frankfurt Feldbahn Museum. After a few years of testing and developing it runs very good. By chance I bought on an auction in UK a vertical boiler of a De Winton quarry tea pot locomotive.

At first i thoght I build a locomotive than my mind changed to build a road engine.

After some investigation I found pictures of a Merryweather Fire King. Than I started 2014 my project.

My workshop has two lathes a small hobbymat and a Saupe or EMCO 7. In addition I have a Saupe mill and a bore mill and a self build motorised metal saw. This is the equipment I have.

with best regards

Werner Schleidt

Thread: injector problems still
10/06/2017 20:15:35

Hallo Ron,

I am Werner from Germany and I had experience using john Cashmores injectors at 3 locomotives without any problem. The day came on a club track the injector failed.

For me it was clear the injector is the problem. The Boiler check valve was OK. At home I tried from my other

locos perfect working injectors and they failed in the same way. At each time the injector want to start suddenly a steam water spray came out of the injector.

I decide to give a try with a silicon pipe with a water valve between in a external test pipe.

The injectors worked all very well. Then I test with the orignal valve from the loco with the silicon testpipe.

And the failure was very clear, if the injector trys to start and failed there were many many very small air bubbles

to see. That was the reason why the injector failed. The water valve wa water tight but not air thight.

I replaced the water valve and the injectors worked very well again.

That is what I learned from practice. And I have later learned to built injectors by my own with many try and error

but the work in the same way as the copied comercial ones.

best regards

Werner

Magazine Locator

Want the latest issue of Model Engineer or Model Engineers' Workshop? Use our magazine locator links to find your nearest stockist!

Find Model Engineer & Model Engineers' Workshop

Sign up to our Newsletter

Sign up to our newsletter and get a free digital issue.

You can unsubscribe at anytime. View our privacy policy at www.mortons.co.uk/privacy

Latest Forum Posts
Support Our Partners
cowells
Sarik
MERIDIENNE EXHIBITIONS LTD
Subscription Offer

Latest "For Sale" Ads
Latest "Wanted" Ads
Get In Touch!

Do you want to contact the Model Engineer and Model Engineers' Workshop team?

You can contact us by phone, mail or email about the magazines including becoming a contributor, submitting reader's letters or making queries about articles. You can also get in touch about this website, advertising or other general issues.

Click THIS LINK for full contact details.

For subscription issues please see THIS LINK.

Digital Back Issues

Social Media online

'Like' us on Facebook
Follow us on Facebook

Follow us on Twitter
 Twitter Logo

Pin us on Pinterest

 

Donate

donate