Stewart Hart | 30/06/2010 08:35:40 |
![]() 674 forum posts 357 photos | I'm building a 3 1/2" gauge Mabel I've got a air running chasie, and I'm nearing the completion of the boiler but I've run into a problem with the backhead. I've made and soldered the firebox back in place complete with fire hole this is made exactly to drawing with the fire hole centre 1 13/16 from the top of the fire box, but this puts the fire hole 1/4" to high in the back head so I'm assuming that the drawing is wrong.
If I make the fire hole in the backhead fit, the water gauge and clacks will stop the fire hole door from opening, hinging the door from the bottom will get around this, just to check this fit out I made the clacks and water gauge, and came across another problem there is no way these parts will screw into the backhead together without fouling on each other.I'm now thinking of making a new backhead and repositioning the fittings on it. Are there any other Mabel Builders out their who have come up against this problem, and how did you get round it, or can anyone else give advice that will help me solve the problem.
Stew
|
Please login to post a reply.
Want the latest issue of Model Engineer or Model Engineers' Workshop? Use our magazine locator links to find your nearest stockist!
Sign up to our newsletter and get a free digital issue.
You can unsubscribe at anytime. View our privacy policy at www.mortons.co.uk/privacy
You can contact us by phone, mail or email about the magazines including becoming a contributor, submitting reader's letters or making queries about articles. You can also get in touch about this website, advertising or other general issues.
Click THIS LINK for full contact details.
For subscription issues please see THIS LINK.