combining the pipework plumbing
Ken Bevan | 13/11/2019 10:32:59 |
15 forum posts | I am at the stage of completing the pipework for the top-feed on my GWR 3.5" gauge loco from the two injectors and the tender hand pump. I have made two vertical clacks for the top feed but now realise that I do not have any provision for the feed from the hand pump to the boiler other than the two top feeds. Would the injector feed be compromised if I tee into the injector feed for the hand pump? |
Chris Gunn | 13/11/2019 20:02:43 |
459 forum posts 28 photos | Ken, not if you fit non return valves between the hand pump and injector feeds and the clack, so the injector and pump cannot feed back through the other. Chris Gunn |
Ken Bevan | 14/11/2019 19:07:40 |
15 forum posts | Thanks Chris. I rather hoped that might be the case, but not having fitted injectors on previous builds I wasn't sure. Regards Ken Bevan |
Please login to post a reply.
Want the latest issue of Model Engineer or Model Engineers' Workshop? Use our magazine locator links to find your nearest stockist!
Sign up to our newsletter and get a free digital issue.
You can unsubscribe at anytime. View our privacy policy at www.mortons.co.uk/privacy
You can contact us by phone, mail or email about the magazines including becoming a contributor, submitting reader's letters or making queries about articles. You can also get in touch about this website, advertising or other general issues.
Click THIS LINK for full contact details.
For subscription issues please see THIS LINK.